26CHAPTER 2: INSTALLING THE SWITCH

existing unit. If you do not initialize the unit, problems may be caused by conflicting Switch configurations.

When the Switch units are interconnected they are assigned a unit

 

number dependent on which XRN Interconnect Cable end is

 

connected to which Switch. That is, the Switch with the blue cable

 

end will be assigned the identity of Unit 1 and the Switch with the

 

yellow cable end will be assigned the identity of Unit 2.

 

For a detailed description of how XRN Technology operates and

 

implementation guidelines, please refer to the Implementation Guide on

 

the CD-ROM that accompanies your Switch or on the 3Com Web site.

 

 

The Power-up

The following sections describe how to get your Switch powered-up and

Sequence

ready for operation.

Powering-up the

Use the following sequence of steps to power-up the Switch.

Switch

 

1Plug the power cord into the power socket at the rear of the Switch.

2Plug the other end of the power cord into your power outlet.

The Switch powers-up and runs through its Power On Self Test (POST), which takes approximately 10 seconds.

Checking for Correct During the Power On Self Test, all ports on the Switch are disabled and Operation of LEDs the LEDs light in a rapid sequence.

When the POST has completed, check the Power/Self Test LED to make sure that your Switch is operating correctly. Table 6 shows possible colors for the LED.

Table 6 Power/Self Test LED Colors

Color

State

 

 

Green

The Switch is powered-up and operating

 

normally.

Yellow

The Switch has failed its Power On Self Test

 

(POST) because of an internal problem.

Off

The Switch is not receiving power.

 

 

Page 26
Image 26
3Com DUA1770-0AAA04 Power-up, Sequence, For a detailed description of how XRN Technology operates, Powering-up, Switch