26CHAPTER 2: INSTALLING THE SWITCH
existing unit. If you do not initialize the unit, problems may be caused by conflicting Switch configurations.
■ When the Switch units are interconnected they are assigned a unit
| number dependent on which XRN Interconnect Cable end is |
| connected to which Switch. That is, the Switch with the blue cable |
| end will be assigned the identity of Unit 1 and the Switch with the |
| yellow cable end will be assigned the identity of Unit 2. |
| For a detailed description of how XRN Technology operates and |
| implementation guidelines, please refer to the Implementation Guide on |
| the |
|
|
The | The following sections describe how to get your Switch |
Sequence | ready for operation. |
| Use the following sequence of steps to |
Switch |
|
1Plug the power cord into the power socket at the rear of the Switch.
2Plug the other end of the power cord into your power outlet.
The Switch
Checking for Correct During the Power On Self Test, all ports on the Switch are disabled and Operation of LEDs the LEDs light in a rapid sequence.
When the POST has completed, check the Power/Self Test LED to make sure that your Switch is operating correctly. Table 6 shows possible colors for the LED.
Table 6 Power/Self Test LED Colors
Color | State |
|
|
Green | The Switch is |
| normally. |
Yellow | The Switch has failed its Power On Self Test |
| (POST) because of an internal problem. |
Off | The Switch is not receiving power. |
|
|