3Com DUA1770-0AAA04 Installing The Switch, The Power-up Sequence Switch 4950 - GBIC Operation

Models: DUA1770-0AAA04

1 83
Download 83 pages 57.69 Kb
Page 21
Image 21
INSTALLING THE SWITCH

2

INSTALLING THE SWITCH

 

This chapter contains the information you need to install and set up the Switch. It covers the following topics:

Package Contents

Choosing a Suitable Site

Rack-mounting

Placing Units On Top of Each Other

Creating an XRN Distributed Fabric

The Power-up Sequence

Switch 4950 — GBIC Operation

WARNING: Safety Information. Before installing or removing any components from the Switch or carrying out any maintenance procedures, you must read the safety information provided in Appendix A of this guide.

AVERTISSEMENT: Consignes de sécurité. Avant d'installer ou d'enlever tout composant du Switch ou d'entamer une procédure de maintenance, lisez les informations relatives à la sécurité qui se trouvent dans l'Appendice A de ce guide.

VORSICHT: Sicherheitsinformationen. Bevor Sie Komponenten aus dem Switch entfernen oder dem Switch hinzufuegen oder Instandhaltungsarbeiten verrichten, lesen Sie die Sicherheitsanweisungen, die in Anhang A in diesem Handbuch aufgefuehrt sind.

Page 21
Image 21
3Com DUA1770-0AAA04 manual Installing The Switch, Package Contents Choosing a Suitable Site Rack-mounting