3M 39600 manual Special Set-Up Procedure Continued, Drive Belt Assembly Height

Models: 39600

1 70
Download 70 pages 16.15 Kb
Page 31
Image 31
Special Set-Up Procedure (Continued)

Special Set-Up Procedure (Continued)

WARNING – Turn off electrical power and disconnect power cord from

electrical supply before beginning special set-up procedure, if power cord is not disconnected, severe injury to personnel could result.

Drive Belt Assembly Height

The drive belt assemblies can be raised 48 mm

[2 inches] to provide better conveying of tall boxes.

This change increases the minimum box height that can be taped to 190 mm [7-1/4 inches].

DISASSEMBLE – Figure 5-2

1.It is first necessary to raise the top taping head. Utilize the height adjustment crank and move the upper taping head to the fully raised position.

2.Remove and retain the screw (A), cap washer

(B) and spacer (C) from the front and rear arm assembly pivots.

3.Lift belt drive assembly (D) up off the arm assembly pivots.

REASSEMBLE – Figure 5-3

4.Reassemble the spacer (C) onto the front and rear arm assembly pivots.

5.Install the belt drive assembly (D) onto the pivots and secure with the cap washers (B) and screws

(A).

Note – Both drive belt assemblies must be installed at the same operating height.

Figure 5-2 – Drive Belt Assembly, Disassembly

Figure 5-3 – Drive Belt Assembly, Reassembly

26

Page 31
Image 31
3M 39600 manual Special Set-Up Procedure Continued, WARNING - Turn off electrical power and disconnect power cord from