37

Running studies

Starting a run

With a couple pushes on the keypad buttons, you will be running and viewing your study (ies). Following your study (ies), you can load the data/files into QSP-II to manipulate, analyze, save, and create reports (See Chapter 5 for viewing your logged data in QSP-II).

How to run a noise study

1. If your dosimeter is turned off, press the on/off enter button to power on.

2. Press and hold the run/stop

button.

A 3, 2, 1 countdown will appear.

3.When running, the following will appear:

A run indicator will appear on the top-right side.

The LED indicator will flash green (unless you disabled this in DMS.)

Measurements

Use up/down arrow to move through values.

Views are customizable via QSP-II setup

Flashing green LED indicates running

Battery indicator

Run indicator

Appears when running

Figure 4-8: Display screen while running

053-644, Rev E

Page 37

eg4 & eg3

Page 43
Image 43
3M eg4, eg3 user manual  How to run a noise study, Display screen while running