Acer R910 manual 149

Models: R910

1 192
Download 192 pages 9.17 Kb
Page 159
Image 159

149

3Install the mounting rails to the rack posts.

(1)Determine the vertical position in the rack. Refer to “Vertical mounting hole pattern” on page 146 for more information.

(2)Align and insert the mounting rail into the rack posts’ mounting holes (A).

(3)Make certain the proper mounting holes on the rack post are selected.

(4)Use two metal screws to secure the front and rear mounting rail to the rack (B).

(5)Do the same thing to the other mounting rail.

Page 159
Image 159
Acer R910 manual 149