Apply Power and Check Startup Sequence

Data Management Cable (MGMT Port on CFC12)

@@@@@@@@@@@" "@@@@@ " @@@@@@@@@@@@@"

Allied Telesyn Networks, Inc.

Allied Telesyn 12G Central Fabric Controller

Version 7.0.0.ALPHA.20050720 (Lab-Only Build)

Created on Wed 07/20/2005 at 4:46a

Copyright Allied Telesyn Networks, Inc., 2004

----------------------------------------------

Software Version Information

----------------------------------------------

Build name

: Allied Telesyn 12G Central Fabric Controller

Build type

: Lab-Only Build

Revision

: 7.0.0.ALPHA.20050720

Built on

: Wed 07/20/2005 at 4:46a

Built by

: ccbuild

Environment: ccbuild_R7.0_nightly_integration

Baseline

: Integration Latest

Target

: cfc12

Options

:

----------------------------------------------

Boot ROM Version Information

----------------------------------------------

Boot ROM

:

Allied Telesyn 12G Central Fabric Controller Boot Loader

Revision

:

7.0.b.01.20050527

Built on

:

Tue 05/31/2005 at 6:20p

Built by

:

ssimmons

Environment:

ssimmons_R7.0_cfc12_fdb

Baseline

:

R7.0_Nightly_05_27_05.2360

BuildTarget: bootcfc12

----------------------------------------------

VxWorks Version 5.5.1 for IBM PowerPC 440GP Rev. 2.0

BSP version 1.2/3

Copyright Wind River Systems, Inc., 1984-2002

Memory Size: 255 MB

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

System Time is 2067-04-07 23:52:39.005

System initializing...User Access Verification

User Access Verification

Username:

5.The system will run initialization tests and end with the prompt Username:

6.Input a user ID of officer and a password of officer.

1-32Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

Page 36
Image 36
Allied Telesis 9102, 9103, 9100, 9101 manual