Installing SFP Modules in the AT-x510-28GSX Switch
x510 Series Installation Guide for
To install SFP transceivers in slots 1 to 24 of the
1.Remove the dust plug from a transceiver slot on the switch. Refer to Figure 19.
Figure 19. Removing the Dust Plug from an SFP Slot
2.Remove the transceiver from its shipping container and store the packaging material in a safe location.
3.If you are installing the transceiver in a top slot, position the transceiver with the Allied Telesis label facing up. If you are installing the transceiver in a bottom slot, position the transceiver with the label facing down.
4.Slide the transceiver into the slot until it clicks into place, as shown in Figure 20 on page 64.
63