Allied Telesis AT-X510-28GPX, AT-X510-52GTX, AT-X510-28GTX manual Installing an SFP Transceiver

Models: AT-X510-28GPX AT-X510-28GSX AT-X510-52GPX AT-X510-28GTX AT-X510-52GTX

1 90
Download 90 pages 11.79 Kb
Page 64
Image 64
Figure 20. Installing an SFP Transceiver

Chapter 4: Cabling the Networking Ports

Figure 20. Installing an SFP Transceiver

Note

If you are ready to attach the fiber optic cable to the transceiver, continue with the next step. Otherwise, repeat steps 1 to 4 to install the remaining SFP transceivers in the switch.

5. Remove the dust cover from the transceiver, as shown in Figure 21.

Figure 21. Removing the Dust Cover from an SFP Transceiver

6.Verify the position of the handle on the SFP transceiver. If the transceiver is in a top slot, the handle should be in the upright position, as shown in Figure 22 on page 65. If the transceiver is in a bottom slot, the handle should be in the down position.

64

Page 64
Image 64
Allied Telesis AT-X510-28GPX, AT-X510-52GTX, AT-X510-28GTX, AT-X510-52GPX, AT-X510-28GSX manual Installing an SFP Transceiver