![Installing the Switch in an Equipment Rack](/images/new-backgrounds/124787/124787109x1.webp)
x510 Series Installation Guide for
Installing the Switch in an Equipment Rack
This procedure requires the following items:
Eight bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in “Choosing a Site for the Switch” on page 50. Here is the procedure for installing the switch in a
Caution
The chassis may be heavy and awkward to lift. Allied Telesis recommends that you get assistance when mounting the chassis in an equipment rack. E28
1. Place the unit upside down on a level, secure surface.
Figure 14. Turning the Switch Upside Down
2.Using a
Figure 15. Removing the Rubber Feet
55