Operation

b.For PDUs with and without a transformer:

Close (turn ON) the PDU distribution panel circuit breakers.

When the distribution panel circuit breakers are closed, the PDU power cables and connected equipment are energized.

Note

32

60 kW InfraStruXure PDU—Operation and Configuration

Page 40
Image 40
American Power Conversion PD60G6FK1, PD60F6FK1, PD60L6FK1, PDRPPNX10 manual For PDUs with and without a transformer