Installation

Sequence

Checklist

Site Preparation

Ground Mount Assembly

For MPK Types Only

The 3.7-Meter Earth Station Antenna requires the installation team to perform the assembly in the sequence presented below. Moreover, this sequence should be reviewed to ensure a smooth installation. Use the following checklist to verify and/or determine the installation sequence.

Refer to Foundation Section for guidance in preparing location and installation of the 3.7-Meter Earth Station Antenna foundation.

‰Unpack ground mount assembly

‰Attach ground mount assembly to foundation

‰Organize ground mount hardware

‰Wax galvanized hardware in hardware kit

‰Tighten ground mount hardware to foundation

‰Attach azimuth strut weldment to ground mount assembly

‰Assemble azimuth strut

‰Mount azimuth strut to ground mount assembly

‰Bolt elevation strut brackets to elevation strut

‰Mount elevation strut to ground mount assembly

‰Assemble manual actuator

‰Remove manual actuator (after elevation/azimuth adjustment)

10

Getting Started

Page 10
Image 10
Andrew 3.7-Meter Earth Station Antenna manual Getting Started