Reflector
Unpacking
Step 1
Step 2
The ground mount assembly is now completed with the necessary operational essen- tials. All ground mount options (such as motors) have separate instructional bulletins located in the parts kit that contains the option.
The next step in the installation process is the reflector assembly. Proceed to the instructions on assembling the reflector.
The
NOTE: The instructions below are provided for the
Upon receiving your
While unpacking the shipment, ensure that the correct parts are included by checking them against the packing list. The following steps provide the procedure for unpacking the crate.
The crate arrives on site covered in a white sheath (domestic pack) or wood (export pack). See Figure
Remove the protective covering from crate.
Pry the top crate panel off with a pry bar.
Figure 3-30a: Domestic Pack
43 | Installation Procedures |