Preventive Maintenance
8.0Preventive Maintenance
8.1General
The maintenance of the Silcon DP300E UPS systems should be carried out by trained service engineers. We recommend that you obtain a service and mainte- nance contract from APC or an APC certified and approved provider.
8.2Fan
It is recommended to replace the fans. Please contact your local APC dealer for replacement interval.
8.3Battery
8.3.1Control of batteries
The batteries can be controlled in two ways:
1.Battery capacity test
2.Battery monitor test
For safety reasons battery tests should preferably be made during uncritical periods for the loads connected.
8.3.2Function of battery capacity test
When performing a battery capacity test, the system switches to battery operation until low DC warning appears. The
8.3.3Function of battery monitor test
When performing an automatic or a manual battery monitor test, the
See also section 8.5 “Battery monitor test” for more information and how to perform the test. The result is one of the following:
1.Battery is OK – nothing will happen. Normal
2.Battery has reduced capacity – “Battery weak” is given. Reduced
3.Battery capacity far to low – “Battery defective” is given. Limited to no
7OA0002 US rev. 04
32 | User Guide Silcon DP300E Series 480V |