5.9Battery Temperature Probe Installation
The optional temperature probe is used to monitor the battery string temperature. To get the most representative temperature measurement, the probe should be placed in contact with a battery cell that is centrally located. The probe should be placed directly in contact with the cell (not the frame surrounding the cell). Generally, the cell cover can be used; be careful not to allow the probe body to touch the terminals.
1)Plug the connector end of the temperature probe into J5 the control unit interface card in the base power bay.
2)Route the cable as required to position the probe on the selected battery cell
3)Remove the adhesive protection strip from the probe body and press the adhesive side of the probe on the battery cell cover.
BATTERY | APC PART |
TEMPERATURE | NUMBER |
PROBE CABLE |
|
|
|
15 ft. (4.6m) | |
|
|
50 ft. (15.2m) | |
|
|
Table
5.10
Before initiating
1)Make sure that the external circuit breaker protecting the cables from the battery to the power plant is turned OFF (the battery cables should be connected to the power plant, but the battery should not be connected).
2)Make sure that all load circuit breakers are turned OFF and all load distribution fuses are removed.
3)Verify that all rectifiers have been installed.
5.10.1Apply AC Power
Turn on the circuit breakers that supply ac power to the rectifiers in the MX28B dc power plant. The main screen should appear on the control unit display (see Figure
NOTE: When ac power is initially applied, there is a