Armstrong World Industries 203, 243 Service Reference Manual, CA-239 Wall Sleeve Kit, Accessories

Models: 183 182 203 123 122 242 302 243

1 196
Download 196 pages 63.09 Kb
Page 125
Image 125

Service Reference Manual

ACCESSORIES

7-3

CA-239 Wall Sleeve Kit

The CA-239 wall sleeve kit is designed to facilitate the installation of Magic-Pak units by providing an accurate opening to properly accept a Magic-Pak unit. During the construction of a building, the wall sleeve allows for the unit to remain off-site until the construction is completed.

The wall sleeve is comprised of four assemblies (top, bottom and left and right sides) which assemble easily to form a correctly sized rectangular box to receive a Magic-Pak unit.

When installed and securely fastened to the supporting wall, the wall sleeve provides easy access to the finish wall for weather sealing.

The wall sleeve must always be fastened to the supporting wall and never to the finished wall.

Inspection of Shipment

Upon receipt of equipment, carefully inspect it for possible shipping damage. If damage is found, it should be noted on the carrier’s freight bill. Damage claims should be filed with the carrier immediately. Claims of shortages should be filed with the seller within five days.

Wall Sleeve Assembly

To assemble the wall sleeve, refer to the following directions and Figure 7- 1 on page 7-4.

1.Slide top panel over side panels until retaining clips are engaged in slotted openings.

2.Place side and top assembly down with the front flange against floor and slide bottom panel into side panel slip strips until tabs on bottom panels are locked in place.

3.Attach squaring braces to top and side panels using existing holes. (Do not remove braces until wall sleeve is secured to building.)

4.Attach the support angles to top and side panels using the #8 x 3/8" screws provided. Two sets of holes are provided in the panels for attaching the support angles. The row of holes nearest the front of sleeve will locate the support angles for 1" spacing and the second set of holes will locate the angles for 3-3/4" spacing.

5.Wall sleeve must be square in opening before securing sleeve to building. This is required to assure Magic-Pak unit will slide into the sleeve.

6.Caulk all seams where bottom panel joins to side panels including the front corners of bottom panel and the top of side panel slip joints. Caulk sealing is best accomplished after the wall sleeve is assembled but before it is placed in the wall opening.

SRM-HW/HWC 8/99

Page 125
Image 125
Armstrong World Industries 203, 243 Service Reference Manual, CA-239 Wall Sleeve Kit, Accessories, Inspection of Shipment