SHBBook Page 4 Wednesday, March 3, 1999 8:03 PM
Installation
Cabling and Voltage Requirements
This section describes the cabling and voltage requirements for the NetStacker II 12 port and 24 port hubs.
◆Note: You may connect network cable segments to the hub or disconnect them while the power is on. Plugging in or removing cables while your hub is running will not inter- rupt the traffic or disrupt the operation of the hub.
Cabling Requirements
The cabling for connections to the NetStacker II hubs must meet or exceed the following standards:
10Base-T
100Base-TX
▲Important: Some installations have UTP Category 5 cabling but do not have wall outlets and/or wiring closet punchdown blocks that meet Category 5 requirements.
100Base-FX
Voltage Requirements
Voltage requirements are the same for both hubs: 100 to 240VAC, at 50 to 60Hz, with a 1.2A maximum.
▲Important: Check the AC power line voltage used in your area.
Page