External Module Disassembly Process

External Modules Disassembly Flowchart

The flowchart below gives you a graphic representation on the entire disassembly sequence and instructs you on the components that need to be removed during servicing. For example, if you want to remove the main board, you must first remove the keyboard, then disassemble the inside assembly frame in that order.

Turn off system and peripherals power

Disconnect power and signal cables from system

Remove

Battery

Remove

Remove

Remove

DIMMs

NewCard

SD Dummy

Dummy

Remove

Lower Covers

Remove

 

Remove

 

Remove

 

Remove

VGA Module

 

TV Tuner

 

HDD

 

ODD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remove

WLAN

Remove

HDD2

Screw List

Step

Screw

Quantity

Part No.

 

 

 

 

VGA Module

M2.5*8-I BNI NYLOK

4

86.T48V7.001

 

 

 

 

TV Tuner

M2.0*3.0-I (BKAG)

2

86.ARE07.002

 

(NYLOK) IRON

 

 

WLAN Module

M2.0*3.0-I-NI-NYLOK

2

86.A08V7.005

 

 

 

 

Main HDD Carrier

M3*0.5+3.5I

4

86.TDY07.003

 

 

 

 

ODD Module

M2.5*6.5-I

1

86.ARE07.001

 

(BZN(NYLOK-RED)

 

 

 

 

 

 

ODD Bracket

M2.0*3.0-I (BKAG)

2

86.ARE07.002

 

(NYLOK) IRON

 

 

 

 

 

 

HDD2 Module

M2.0*3.0-I (BKAG)

2

86.ARE07.002

 

(NYLOK) IRON

 

 

HDD2 Carrier

M3*0.5+3.5I

4

86.TDY07.003

 

 

 

 

Chapter 3

49

Page 59
Image 59
Aspire Digital MB.ASR06.001, 6930G External Module Disassembly Process, External Modules Disassembly Flowchart, Nylok Iron