Track Ride Construction Panel

Found on control panels for track rides:

1

4 7

2

3

8

 

5

6

12

10

9

11

 

Park Management Control Panel

Found on control panels for administration:

1

3 4

2

1.Construction Options – Expands the track options portion of the object control window, allowing you to build or change track pieces for the ride.

2.Track Pieces – Shows the tracks you can place next.

3.Lift – Adds or removes the chain drive for the highlighted track piece.

4.Loading Station – Toggles whether or not a boarding station is added to the highlighted track piece.

5.Block Brake – Toggles whether or not a block brake is added to the highlighted track piece. (For track rides with more than one train.)

6.Straight Brake – Toggles whether or not straight brakes are added to the highlighted track piece. (To reduce the speed of trains on a track ride.)

7.Photo Trigger – Toggles whether or not a photo trigger is added to the high- lighted track piece.

8.Bank – Adjusts the banking options for the highlighted track piece.

9.Remove – Removes the selected (or previous) track piece.

10.Autocomplete – Automatically places the remaining tracks for the coaster being edited. After an autocomplete solu- tion is found, click the icon again to accept the autocomplete solution, or click on another track piece to cancel.

11.Height markers – Click to turn the height markers on or off for this ride.

12.Special Tracks – Shows what special tracks may be added next. This selection changes depending on what piece has last been placed.

1.Pin – Minimizes the current window or toolbox and pins it to the edge of the screen

2.Scroll – Scrolls the list up and down.

3.Sort – Sorts the list by the selected criteria.

4.Dropdown – Causes a list to be displayed.

26

27

Page 15
Image 15
Atari 3 Track Ride Construction Panel, Park Management Control Panel, Track Pieces Shows the tracks you can place next