Chapter 2. Hardware Setup

Single Stage Installation

In a Single Stage installation, there are no additional PN0108s daisy chained down from the first unit. To set up a single stage installation, refer to the installation diagram below (the numbers in the diagram correspond to the numbered steps), and do the following:

1.Use the PON cable that was provided with this package to connect the PN0108's PON IN port to the CN-6000's (or other compatible device - see Supported Devices, page 62) PON port.

2.For each device, use one of the AC Outlet power cords supplied with this package to connect from any available PN0108 output port to the device's AC socket. See Power Cords, page vii, for power cord safety information.

3.Safe Shutdown is supported for computers running Windows 98SE, ME, NT, 2000, XP, and Windows Server 2003.

If you choose to utilize the Safe Shutdown feature (use of this feature is optional), for each computer use a Safe Shutdown cable to connect from the PN0108's Safe Shutdown port to the computer's serial port.

Note: You must connect the computer to the same letter designation for both the AC Outlet and Safe Shutdown ports.

4.Use the AC power cord provided with this package to connect the PN0108's Power Socket to an AC power source. See Power Cords, page vii, for power cord safety information.

5.Turn on the PN0108.

6.Turn on the devices.

11