9
INSTALLATION
Step-by-Step Installation Guide

Cautions and Warnings:

Before attempting to connect anything to the PRO2 or your computer(s),
please ensure that everything is powered off. Plugging and unplugging cables
while computer(s) are powered on may cause irreversible damage to the
computer(s) and/or the PRO2(s). Belkin Components is not responsible for
damage caused in this way.
Installing the PRO2 into a Server Rack:

Bracket Installation (F1DA108T and F1DA116T only)

Eight- or 16-Port PRO2s include adjustable mounting brackets ideal for
installation in 19-inch racks. The mounting brackets feature three adjustment
positions to allow the faceplate of the PRO2 to mount flush to your rack-mounted
servers, or to the rack. Please follow these simple steps to achieve the desired
adjustment. The 4-Port PRO2 requires an optional mounting kit (F1D005).
1. Remove the adjustable brackets from the box. (The adjustable brackets
allow you to set the PRO2’s face flush with the ends of the rails or to
extend the PRO2 past the front of the rails).
2. Determine how far you would like the PRO2 to protrude from the rack.
Select a bracket-hole scheme.
3. Attach the bracket to the side of your PRO2 using the Phillips screws
provided. (Refer to diagram above).
4. Mount the PRO2 to the rack rail assembly.
Note: If this PRO2 will be daisy-chained to another PRO2,set the BANK
address prior to installing on a rack. Refer to the section in this user manual
labeled “Connecting Multiple PRO2s (Daisy-Chaining)”.