I N STA L L AT I O N

Example of Daisy-Chain Configuration:

Slave Input

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

cable 1

 

Master unit

(BANK 00)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

 

 

 

Slave unit

 

(BANK 01)

 

 

 

 

 

cable 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

cable 3

 

 

Slave unit

 

(BANK 02)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

 

 

 

Slave unit

 

(BANK 03)

 

 

 

 

 

Connecting the Computers:

9.Connect all computers to the Master and Slave switches. Refer to “Single PRO2 Installation” on page 10 for instruction on how to connect the Console and the computers to the PRO2.

10.Connect the power supply to the Master switch. Power up the Master switch. You should see the Master switch light up and display the digits “00”, indicating its BANK address.

11.Power up the Slave switches sequentially, beginning with Bank 01, by connecting each unit’s power supply. Each switch should display its corresponding BANK address number as it is powered up.

Note: If the PRO2s do not enumerate correctly, reset the Master switch (BANK 00) by simultaneously pressing the "BANK +" and "BANK –" buttons. You can also reset the Master switch to detect newly added Slave switches.

If the switches still do not enumerate correctly, check that all switches have the correct BANK address assigned to them and that all daisy-chain cables are connected properly.

12.Verify that the Master unit has detected all Slave switches by scrolling through the BANKS using the BANK up and BANK down buttons.

If all Slave switches are detected properly, the LED display on the Master switch will register and display the attached Slave switch’s BANK address.

15

Page 17
Image 17
Belkin F1DA104T user manual Example of Daisy-Chain Configuration, Connecting the Computers