Maintenance and Lubrication Schedule

1500

Cycles

continued

Make sure lift operates smoothly

Inspect external snap rings:

Handrail pivot pins (2 per pin)

Platform slide/rotate pivot pins (2 per pin)

Platform fold axles (1 per axle)

Inner roll stop lever bracket pins (1 per pin)

Lift-Titelatch gas (dampening) spring (2 per)

Outboard platform pivot pins (1 per pin)

Gear weldment pivot pins (1 per pin)

Inspect platform fold axles and bearings for wear or damage and positive securement

Inspect platform fold link rollers and bearings for wear or damage and positive securement

Remove pump module cover and inspect:

‡+\GUDXOLFKRVHVÀWWLQJVDQGFRQQHFWLRQVIRU wear or leaks

Harness cables, wires, terminals and connec- tions for securement or damage

Control board, circuit breaker, power switch and lights for securement or damage

Realign towers and vertical arms. Lubri- cate or correct as needed.

Resecure or replace if needed.

Replace damaged parts and resecure as needed. Apply Light Oil.

Resecure, replace or correct as needed. Note: Apply Loctite® to threads if needed.

Resecure, replace or correct as needed.

Page 47

Page 49
Image 49
Braun NVL SERIES manual Maintenance and Lubrication Schedule