Maintenance and Lubrication Schedule
Perform all procedures listed in previous section also
4500
Cycles
Inspect cotter pins on platform pivot pin (2)
Hydraulic Fluid (Pump) - Check level. Note: Fluid should be changed if there is visible contamination. ,QVSHFWWKHK\GUDXOLFV\VWHPF\OLQGHUKRVHVÀW- WLQJVVHDOVHWFIRUOHDNVLIÁXLGOHYHOLVORZ
,QVSHFWF\OLQGHUVÀWWLQJVDQGK\GUDXOLFFRQQHFWLRQV for wear, damage or leaks
Inspect parallel arms, bushings and pivot pins for visible wear or damage
Inspect parallel arm pivot pin mounting bolts (8)
Inspect vertical arms, handrails and pivot pins for visible wear or damage
Inspect upper/lower fold arms, rotating pivot slide arms, slide support arms and associated pivot pins, bushings, and bearings for visible wear or damage
Resecure, replace or correct as needed
Use Braun
Tighten, repair or replace if needed.
Replace if needed.
Tighten or replace if needed.
Replace damaged parts and lubricate if needed
Replace if needed.
Page 48