Bryant 551A I. Pre-Start-Up, Ii. Start-Up, Electrical, Temperatures, General, Start-Upchecklist

Models: 551A

1 36
Download 36 pages 40.32 Kb
Page 36
Image 36
START-UP CHECKLIST

 

 

 

 

START-UP CHECKLIST

 

MODEL NO.:

 

 

SERIAL NO.:

 

 

DATE:

 

 

 

TECHNICIAN:

 

 

I. PRE-START-UP:

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT (155 UNITS) OR ADJUSTMENT BOLT AND PLATE (180, 240 UNITS)

VERIFY INSTALLATION OF OUTDOOR AIR HOOD

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT CHECK THAT FILTERS AND SCREENS ARE CLEAN AND IN PLACE

VERIFY THAT UNIT IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

￿VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED FOR 24 HOURS

II. START-UP:

ELECTRICAL

SUPPLY VOLTAGE

 

 

L1-L2

 

 

 

 

L2-L3

 

L3-L1

 

 

COMPRESSOR AMPS — COMPRESSOR NO. 1

L1

 

 

 

 

L2

 

L3

 

 

 

— COMPRESSOR NO. 2

L1

 

 

 

 

L2

 

L3

 

 

SUPPLY FAN AMPS

 

 

EXHAUST FAN AMPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRIC HEAT AMPS (IF SO EQUIPPED)

L1

 

 

 

L2

L31

 

TEMPERATURES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR-AIR TEMPERATURE

 

F DB (Dry-Bulb)

 

 

 

 

 

 

 

 

 

 

 

 

 

RETURN-AIR TEMPERATURE

 

F DB

 

 

 

 

 

 

F WB (Wet-Bulb)

 

 

 

 

 

 

COOLING SUPPLY AIR

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRIC HEAT SUPPLY AIR (IF SO EQUIPPED)

 

 

F

 

 

PRESSURES￿

 

 

 

 

 

 

 

 

REFRIGERANT SUCTION

CIRCUIT NO. 1

 

PSIG

CIRCUIT NO. 2

 

PSIG

REFRIGERANT DISCHARGE CIRCUIT NO. 1

 

PSIG

CIRCUIT NO. 2

 

PSIG

VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 29.

GENERAL

￿ECONOMI$ER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES

I. PRE-START-UP:CUT ALONG DOTTED LINE

II. START-UP:CUT ALONG DOTTED LINE

Copyright 2001 Bryant Heating & Cooling Systems

CL-1

CATALOG NO. 5355-105

Page 36
Image 36
Bryant 551A operation manual I. Pre-Start-Up, Ii. Start-Up, Electrical, Temperatures, General, Start-Upchecklist