Bryant 580G manual Start-Upchecklist, Electrical, Temperatures, Pressures, Pre-Start-Up

Models: 580G

1 44
Download 44 pages 8.75 Kb
Page 43
Image 43

 

 

 

START-UP CHECKLIST

MODEL NO.:

 

 

SERIAL NO.:

 

 

SOFTWARE VERSION (SEE FIG. 11)

 

TECHNICIAN:

 

DATE:

 

 

 

 

 

PRE-START-UP:

VERIFY THAT DIP SWITCH SETTINGS ARE CORRECT

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTRUCTIONS

VERIFY INSTALLATION OF ECONOMIZER HOOD

VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS

VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT

CHECK GAS PIPING FOR LEAKS

CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE

VERIFY THAT UNIT IS LEVEL WITHIN TOLERANCES

CHECK FAN WHEELS AND PROPELLERS FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

VERIFY THAT SUCTION, DISCHARGE, AND LIQUID SERVICE VALVES ON EACH CIRCUIT ARE OPEN

START-UP:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUPPLY VOLTAGE L1-L2

 

 

 

 

 

L2-L3

 

 

 

 

 

 

 

 

 

L3-L1

 

 

 

 

 

 

 

 

 

 

COMPRESSOR AMPS Ð COMPRESSOR NO. 1

L1

 

 

 

 

 

 

 

L2

 

 

 

 

L3

 

 

 

 

 

Ð COMPRESSOR NO. 2

L1

 

 

 

 

 

 

L2

 

 

 

 

L3

 

 

 

 

SUPPLY FAN AMPS

 

 

 

 

 

EXHAUST FAN AMPS

 

 

 

 

 

 

 

 

 

 

 

 

 

TEMPERATURES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR-AIR TEMPERATURE

 

 

 

 

 

F DB (Dry Bulb)

 

 

 

 

 

 

 

 

 

 

 

 

 

RETURN-AIR TEMPERATURE

 

 

 

 

 

 

F DB

 

 

 

 

F WB (Wet Bulb)

 

 

 

 

 

COOLING SUPPLY AIR

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS HEAT SUPPLY AIR

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRESSURES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS INLET PRESSURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IN. WG

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS MANIFOLD PRESSURE

 

STAGE NO. 1

 

 

 

 

 

 

 

IN. WG

 

STAGE NO. 2

 

 

 

IN. WG

REFRIGERANT SUCTION

CIRCUIT NO. 1

 

 

 

 

 

 

 

PSIG

 

CIRCUIT NO. 2

 

 

 

PSIG

REFRIGERANT DISCHARGE

 

CIRCUIT NO. 1

 

 

 

 

 

 

 

PSIG

 

CIRCUIT NO. 2

 

 

 

PSIG

VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGE 31

CL-1

Page 43
Image 43
Bryant 580G manual Start-Upchecklist, Electrical, Temperatures, Pressures, Pre-Start-Up