CONTROLS
OPERATING SEQUENCE
Heating — On a call for heating, terminal “W” of the thermostat is energized, starting the
Cooling — When the room temperature rises to a point that is slightly above the cooling control setting of the thermostat, the thermostat completes the circuit between thermostat terminal R to terminals Y and G. These completed circuits through the ther- mostat connect contactor coil (C) (through unit wire Y) and blow- er relay coil (BR) (through unit wire G) across the
The normally open contacts of energized contactor (C) close and complete the circuit through compressor motor (COMP) to con- denser (outdoor) fan motor (OFM). Both motors start instantly.
The set of normally open contacts of energized relay BR close and complete the circuit through evaporator blower (indoor) fan motor (IFM).
NOTE: Once the compressor has started and then has stopped, it should not be started again until 5 minutes have elapsed.
The cooling cycle remains “on” until the room temperature drops to a point that is slightly below the cooling control setting of the room thermostat. At this point, the thermostat “breaks” the circuit between thermostat terminal R to terminals Y and G. These open circuits
The ICM FIOP indoor blower operation with a call for fan oper- ation (G) in cooling mode will perform by the on/off delay profile selected on the Easy Select™ circuit board.