Bryant R-22 service manual Superheatcharging Table, Requiredvapor Temperature F

Models: R-22

1 52
Download 52 pages 54.32 Kb
Page 44
Image 44
TABLE 21—SUPERHEAT CHARGING TABLE

TABLE 21—SUPERHEAT CHARGING TABLE

OUTDOOR TEMP (°F)

 

 

 

 

 

 

INDOOR COIL ENTERING AIR TEMP (°F WET BULB)

 

 

 

 

50

52

 

54

 

56

 

58

 

60

62

64

66

68

 

70

72

74

76

 

 

 

 

 

 

55

9

12

 

14

 

17

 

20

 

23

26

29

32

35

 

37

40

42

45

60

7

10

 

12

 

15

 

18

 

21

24

27

30

33

 

35

38

40

43

65

6

 

10

 

13

 

16

 

19

21

24

27

30

 

33

36

38

41

70

 

7

 

10

 

13

 

16

19

21

24

27

 

30

33

36

39

75

 

 

6

 

9

 

12

15

18

21

24

 

28

31

34

37

80

 

 

 

5

 

8

12

15

18

21

 

25

28

31

35

85

 

 

 

 

8

11

15

19

 

22

26

30

33

90

 

 

 

 

5

9

13

16

 

20

24

27

31

95

 

 

 

 

6

10

14

 

18

22

25

29

100

 

 

 

 

8

12

 

15

20

23

27

105

 

 

 

 

5

9

 

13

17

22

26

110

 

 

 

 

6

 

11

15

20

25

115

 

 

 

 

 

8

14

18

23

Where a dash appears, do not attempt to charge system under these conditions or refrigerant slugging may occur.

TABLE 22—REQUIRED VAPOR TEMPERATURE (°F)

SUPERHEAT TEMP

 

 

VAPOR PRESSURE AT SERVICE PORT (PSIG)

 

 

(°F)

61.5

64.2

67.1

70.0

73.0

76.0

79.2

82.4

85.7

0

35

37

39

41

43

45

47

49

51

2

37

39

41

43

45

47

49

51

53

4

39

41

43

45

47

49

51

53

55

6

41

43

45

47

49

51

53

55

57

8

43

45

47

49

51

53

55

57

59

10

45

47

49

51

53

55

57

59

61

12

47

49

51

53

55

57

59

61

63

14

49

51

53

55

57

59

61

63

65

16

51

53

55

57

59

61

63

65

67

18

53

55

57

59

61

63

65

67

69

20

55

57

59

61

63

65

67

69

71

22

57

59

61

63

65

67

69

71

73

24

59

61

63

65

67

69

71

73

75

26

61

63

65

67

69

71

73

75

77

28

63

65

67

69

71

73

75

77

79

30

65

67

69

71

73

75

77

79

81

32

67

69

71

73

75

77

79

81

83

34

69

71

73

75

77

79

81

83

85

36

71

73

75

77

79

81

83

85

87

38

73

75

77

79

81

83

85

87

89

40

75

77

79

81

83

85

87

89

91

 

 

 

 

 

 

 

 

 

 

a TXV, the subcooling method must be used. Heat pumps must be operating in the cooling mode. To charge by superheat, a service technician needs an accurate superheat thermocouple or thermistor-type thermometer, a sling psychrometer, and a gage manifold. Do not use mercury or small-dial-type thermometers as they are not adequate for this type of measurement. Then use 1 of the following procedures:

SUPERHEAT CHARGING METHOD

1.Operate a unit a minimum of 10 minutes before checking charge.

2.Measure vapor pressure by attaching a gage to vapor valve-service port.

3.Measure vapor-line temperature by attaching a service thermometer to unit vapor line near vapor valve. On a heat pump, attach to the suction tube between the accumulator and the compressor. Insulate thermometer for accurate readings.

4.Measure outdoor-air, dry-bulb temperature with a second thermometer.

—44—

5.Measure indoor-air (entering indoor coil), wet-bulb tem- perature with a sling psychrometer.

6.Locate outdoor temperature and evaporator entering air wet-bulb temperature in Table 21. At this intersection note the superheat.

7.Locate superheat temperature located in previous step and vapor pressure in Table 22. At this intersection note vapor-line temperature.

8.If unit has a higher vapor-line temperature than charted temperature, add refrigerant until charted temperature is reached.

9.If unit has a lower vapor-line temperature than charted temperature, bleed refrigerant until charted temperature is reached.

10.If outdoor-air temperature or pressure at vapor valve changes, charge to new vapor-line temperature indicated on chart.

SUBCOOLING CHARGING METHOD

1.Operate unit a minimum of 15 minutes before checking charge.

Page 44
Image 44
Bryant R-22 service manual Superheatcharging Table, Requiredvapor Temperature F