Bunn System III manual SERVICE cont DISPENSE VALVE

Models: System III

1 40
Download 40 pages 46.35 Kb
Page 21
Image 21
SERVICE (cont.)

SERVICE (cont.)

DISPENSE VALVE

 

 

 

L2

L1T

 

L4

L3

T

 

5

T

 

 

TL

T

 

 

 

P2231.35

FIG. 10 DISPENSE VALVE

Location:

Dispense valve is located inside the hood directly above the sprayhead.

Test Procedures:

1.Disconnect the brewer from the power source.

2.Disconnect the wires from the dispense valve and check for continuity across the dispense valve coil terminals.

If continuity is present as described, reconnect the wires to the dispense valve and proceed to #3.

If continuity is not present as described, replace the dispense valve.

3.With a voltmeter, check the voltage across dis- pense valve using the white/violet wire and white/ green wire on electro/mechanical models, or white/ red wire and white/green wire on DBC models. Connect brewer to the power source. Place the "ON/OFF (Warmer)" switch in the "ON" (upper) position. Press and release the start switch. The indication must be:

a.) 120 volts ac for three wire 120/208 volt models and three wire 120/240 volt models.

b.) 200 to 240 volts ac for two wire 200 or 240 volt models.

4.Disconnect brewer from the power source.

If voltage is present as described in step 3, proceed to #5.

If voltage is not present as described, refer to the Wiring Diagrams and check the brewer wiring har- ness.

5.Check the dispense valve for coil action. Connect the brewer to power source. Place the "ON/OFF (Warmer)" switch in the "ON" (upper) position, press and release the start switch. Listen carefully in the vicinity of the dispense valve for a "clicking" sound as the coil magnet attracts and repels the plunger.

6.Disconnect the brewer from the power source.

If the sound is heard as described, there may be a blockage in the dispense valve or the water line to the dispense valve. Remove the dispense valve and in- spect for wear, and remove waterborne particles.

If the sound is not heard as described, replace the dispense valve.

Removal and Replacement:

1.Disconnect wires from dispense valve.

2.Drain enough water from the tank so the dispense valve is above the water line.

3.Remove water lines and hose barb fitting from dispense valve.

4.Remove dispense valve from the sprayhead panel.

5.Install new dispense valve .

6.Reconnect the water lines, hose barb fitting and the wires to the dispense valve.

7.Refer to Fig. 11 when reconnecting wires.

WHI/VIO to Timer TL1

WHI/VIO to ON/OFF Switch

WHI/RED to Brew Selector Switch

WHI/GRN to Timer TL4

WHI/GRN to By-Pass Valve

ELECTROMECHANICAL

WHI/RED to DBC Board J1-2

WHI/RED to Brew Selector Switch

WHI/GRN to Bypass Valve

WHI to DBC J1-3 (120/208 or 120/240 Volt

Models

RED to DBC J1-3 (200 or 240 Volt Models)

DIGITAL CONTROL (DBC)

P1106

FIG. 11 DISPENSE VALVE TERMINALS

Page 21

27362

092900

 

 

Page 21
Image 21
Bunn System III manual SERVICE cont DISPENSE VALVE