Bunn System III manual SERVICE cont

Models: System III

1 40
Download 40 pages 46.35 Kb
Page 26
Image 26
Manual background

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE (Electro/ mechanical only)(cont.)

b.) 200 to 240 volts ac for two wire 200 or 240 volt models after a delay of approximately 1 second.

17. Disconnect the brewer from the power source.

If voltage is present as described, reinstall the probe, the level control board and level probe are operating properly.

If voltage is not present as described, check the pink probe wire for continuity. If no continuity is present, replace or repair pink wire.

Removal and Replacement:

1.Remove all wires from the level control board.

2.Remove two #8-32 screws and lockwashers hold- ing level control board to component bracket.

3.Install the new level control board to the compo- nent bracket. Make certain that the lockwashers are between the level control board and the com- ponent bracket.

4.Refer to Fig. 16 when reconnecting the wires.

T4 PNK to Probe

T3 WHI to Terminal Block (WHI

Insert on 120/208 or 120/240V

Brewers)

T3 RED to Terminal Block (RED

Insert on 200V or 240V brewers)

T2 BLU from Overflow Protection

Switch

T1 VIO to Solenoid Coil

FIG. 16 LIQUID LEVEL CONTROL BOARD

P1100

 

TERMINALS

 

Page 26

27362

092900

 

 

Page 26
Image 26
Bunn System III manual SERVICE cont