ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in Initial
L2REDL2 RED
WHITE
120V.A.C.
208 or 240V.A.C.
L1 BLACK | 200 OR 240V.A.C. |
NEUTRAL120V.A.C.
BLACK
P1841
Requires
P2185
"A" & "B" models require
Electrical Hook-Up
CAUTION – Improper electrical installation will damage electronic components.
1.An electrician must provide electrical service as specified.
2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.Remove the front panel beneath the sprayhead.
Models with digital brewer control assembly:
Place the tank heater toggle switch at the bottom left of the control assembly in the "OFF" position.
Models with electro/mechanical thermostats:
Rotate the control thermostat knob fully counterclockwise to the "OFF" position.
4.Feed the cord through the strain relief and connect it to the terminal block.
5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace the front panel.
6.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 20 (138) and 90 psi (620 kPa) from a 1⁄2" or larger supply line. A
NOTE –
This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
Plumbing Hook-Up
1.Remove the 3⁄8" flare cap from the bulkhead fitting on the bottom of the brewer.
2.Flush the water line and securely attach it to the bulkhead fitting on the bottom of the brewer.
3.Turn on the water supply.
Page 4 | 27362 | 092900 |
|
|