Bunn System III manual SERVICE cont

Models: System III

1 40
Download 40 pages 46.35 Kb
Page 25
Image 25
Manual background
FIG. 15 LIQUID LEVEL CONTROL BOARD AND PROBE

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE (Electro/ mechanical only)

 

3TL

2LT

LT1

LT5

L4T

 

 

P2231.30

Location:

The level control board is located inside the front of the brewer on the lower left side of the component bracket. The level probe is located inside the hood on the left center rear of the tank lid next to the limit thermostat.

Test Procedure:

1.Disconnect the brewer from the power source.

2.Remove the violet wire from terminal 1 & pink wire from terminal 4 of the circuit board.

3.With a voltmeter, check the voltage across termi- nals 2 & 3. Connect the brewer to the power source. The indication must be:

a.) 120 volts ac for three wire 120/208 volt models and three wire 120/240 volt models.

b.) 200 to 240 volts ac for two wire 200 or 240 volt models.

4.Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5.

If voltage is not present as described, refer to the Wiring Diagrams and check the brewer wiring har- ness.

5. Reconnect the violet wire to terminal 1.

6.Carefully connect a piece of insulated jumper wire to terminal 4. Keep the other end of this wire away from any metal surface of the brewer.

7.With a voltmeter, check the voltage across termi- nals 1 & 3. Connect the brewer to the power source. The indication must be:

a.) 120 volts ac for three wire 120/208 volt models and three wire 120/240 volt models after a delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt models after a delay of approximately 1 second.

8.Touch the free end of jumper wire to the brewer housing. The indication must be 0.

9.Move the jumper wire away from the brewer housing. The indication must again be:

a.)120 volts ac for three wire 120/208 volt models and three wire 120/240 volt models after a delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt models after a delay of approximately 1 second.

10.Disconnect the brewer from the power source and remove the jumper wire from terminal 4.

If voltage is present as described, the level control board is operating properly, proceed to #11.

If voltage is not present as described, replace the level control board.

11.Reconnect the pink wire to terminal 4.

12.Gently pull the probe out of the tank lid and inspect for corrosion. Replace it if necessary.

13.Place the probe so that neither end is in contact with any metal surface of the brewer.

14.With a voltmeter, check the voltage across termi- nals 1 & 3. Connect the brewer to the power source. The indication must be:

a.) 120 volts ac for three wire 120/208 volt mod- els and three wire 120/240 volt models after a delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt models after a delay of approximately 1 second.

15.Move the probe's flat end to the brewer housing. The indication must be 0.

16.Move the probe's flat end away from the brewer housing. The indication should be:

a.)120 volts ac for three wire 120/208 volt models and three wire 120/240 volt models after a delay of approximately 1 second.

Page 25

27362

092996

 

 

Page 25
Image 25
Bunn System III manual SERVICE cont