Issue 1 July 2006 35
Chapter 3: InstallationThe C360 switch is ready to work after you complete the installation instructions described in
this chapter. After you have completed the procedures in this chapter, proceed to
Chapter 4: Powering Up the Avaya C360
The following steps are described in this chapter:
●Preparing Needed Tools
●Site Preparation
●Rack Mounting (Optional)
●Wall Mounting (Optional)
●Stacking (optional)
●Making Connections to Network Equipment
●Installing SFP GBIC Transceivers
Preparing Needed Tools
Prepare the tools you need to mount the Replace variable w/ short product name, according to
the Tabl e 5:
Table5: Mounting Tools
If you need to mount on... Prepare these tools
Rack or wall Phillips head screwdriver
Flat wall screws to fasten Replace variable w/ short
product name to the wall
Uneven wall ●16.3" x 18.3" (415 x 465 mm) plywood
board 0.8" (20 mm) thick
wood screws
●screws to fasten the Replace variable w/
short product name to the wall