Carrier 50RHE006-060 Typical Installation - 50RHE Units, Unit Hanger Isolation Detail

Models: 50RHE006-060

1 32
Download 32 pages 52.62 Kb
Page 5
Image 5
UNIT HANGER ISOLATION DETAIL

 

 

 

ReturnLoop

 

 

 

3/8” threaded rods

Supply Loop

 

 

 

(by others)

 

 

 

 

 

 

 

Filter Access

 

Water In

 

 

Water Out

 

 

 

Return Air

 

 

 

 

 

 

 

(Ductwork

 

 

 

 

not shown)

Thermostat

 

 

 

 

 

Field-supplied transition to

 

 

Wiring

 

 

Power Wiring

 

Balancing Valve (Field

minimize pressure loss

 

Field-supplied

 

 

 

installed and calibrated

Supply Air

 

 

stainless steel

accessory)

 

 

braid hose

 

 

 

 

Low Pressure Drop Water

 

 

 

with integral

 

 

 

“J” swivel

Control Valve (optional)

 

 

 

 

(field-installed accessory)

 

 

Unit Power

 

 

 

Flexible

 

 

 

Insulated supply duct with

Connection

 

 

Water Out

 

Unit Power

 

at least one 90 degree elbow

Field-Supplied

 

to reduce air noise

Disconnect

 

Water In

Electric Heat

 

(field supplied)

 

 

 

(if applicable)

 

 

 

 

Unit Hanger

Ball Valve with optional

 

 

 

 

 

integral P/T plug (typical for supply

and return piping)

3/8” Threaded Rod (by others)

Vibration Isolator (white-compressor end and red-blower end) size 042-070

Washer (by others)

Double Hex Nuts (by others)

50RHR, RHS: Install screw as shown Fig. 2 — Typical Installation — 50RHE Units Sizes 042-060

Optional on smaller sizes

50RHC: Screw must only be

 

1/2” long to

Integral hanger support-

prevent damage

pre-attached in factory

UNIT HANGER ISOLATION DETAIL

Fig. 2 — Typical Installation — 50RHE Units

5

Page 5
Image 5
Carrier 50RHE006-060 specifications Typical Installation - 50RHE Units, Unit Hanger Isolation Detail