50ZH024-060 Packaged Heat Pump Units

Visit www.carrier.com

Installation, Start-Up and Service Instructions

NOTE: Read the entire instruction manual before starting the installation.

TABLE OF CONTENTS

 

SAFETY CONSIDERATIONS

1

INTRODUCTION

2

RECEIVING AND INSTALLATION

2

Check Equipment

2

IDENTIFY UNIT

2

INSPECT SHIPMENT

2

Provide Unit Support

2

SLAB MOUNT

2

GROUND MOUNT

2

Provide Clearances

2

Place Unit

2

Select and Install Ductwork

2

INSTALL FLANGES FOR DUCTWORK CONNEC-

TIONS (50ZH060 ONLY)

6

CONVERTING HORIZONTAL DISCHARGE UNITS TO

DOWNFLOW (VERTICAL) DISCHARGE

6

Provide for Condensate Disposal

6

Install Electrical Connections

7

HIGH-VOLTAGE CONNECTIONS

7

ROUTING POWER LEADS INTO UNIT

8

CONNECTING GROUND LEAD TO UNIT

GROUND

8

ROUTING CONTROL POWER WIRES

8

ACCESSORY ELECTRIC HEAT WIRING

8

SPECIAL PROCEDURES FOR 208-V OPERATION

8

PRE-START-UP

9

START-UP

9

Check for Refrigerant Leaks

10

LOCATE AND REPAIR REFRIGERANT LEAKS AND

CHARGE THE UNIT AS FOLLOWS:

10

Start-Up Cooling Section and Make Adjustments

10

CHECKING COOLING CONTROL OPERATION

10

COMPRESSOR ROTATION

10

Refrigerant Charge

10

NO CHARGE

10

LOW CHARGE COOLING

10

TO USE THE COOLING CHARGING CHART

10

HEATING MODE CHARGE

11

Indoor Airflow and Airflow Adjustments

11

FOR 208/230-V

12

FOR 460-V MOTORS

12

Unit Controls

12

HIGH-PRESSURE RELIEF VALVE

12

LOSS OF CHARGE SWITCH

12

COMPRESSOR OVERLOAD

12

Sequence of Operation

12

FAN OPERATION

12

COOLING

14

HEAT PUMP HEATING

14

DEFROST

15

ELECTRIC RESISTANCE HEATING

15

MAINTENANCE

15

Air Filter

16

Unit Top Removal (Outdoor-Coil Side)

16

Indoor Blower and Motor

16

Outdoor Coil, Indoor Coil, and Condensate Drain Pan

16

Outdoor Fan

17

Electrical Controls and Wiring

18

Refrigerant Circuit

18

Indoor Airflow

18

Metering Devices

18

Lubrication

18

Liquid Line Strainer

18

High Flow Valves

19

TROUBLESHOOTING

22

START-UP CHECKLIST

23

NOTE TO INSTALLERÐBefore installation, READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY. Also, make sure the User's Manual and Replacement Guide are left with the unit after installation.

C00155

Fig. 1ÐUnit 50ZH

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment can be hazardous due to system pressure and electrical components. Only trained and qualified workers should install, repair, or service air-conditioning equipment.

Untrained workers can perform basic maintenance functions of cleaning coils and filters. All other operations should be performed by trained service people. When working on air-conditioning

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book

1

4

PC 101

Catalog No. 535-00080

Printed in U.S.A.

Form 50ZH-5SI

Pg 1

7-03

Replaces: 50ZH-4SI

Tab

6

8

 

 

 

 

 

 

 

Page 1
Image 1
Carrier 50ZH024-060 instruction manual Table of Contents, Safety Considerations