
Visit www.carrier.com
Installation, Start-Up and Service Instructions
NOTE: Read the entire instruction manual before starting the installation.
TABLE OF CONTENTS |
|
SAFETY CONSIDERATIONS | 1 |
INTRODUCTION | 2 |
RECEIVING AND INSTALLATION | 2 |
Check Equipment | 2 |
IDENTIFY UNIT | 2 |
INSPECT SHIPMENT | 2 |
Provide Unit Support | 2 |
SLAB MOUNT | 2 |
GROUND MOUNT | 2 |
Provide Clearances | 2 |
Place Unit | 2 |
Select and Install Ductwork | 2 |
INSTALL FLANGES FOR DUCTWORK CONNEC- | |
TIONS (50ZH060 ONLY) | 6 |
CONVERTING HORIZONTAL DISCHARGE UNITS TO | |
DOWNFLOW (VERTICAL) DISCHARGE | 6 |
Provide for Condensate Disposal | 6 |
Install Electrical Connections | 7 |
7 | |
ROUTING POWER LEADS INTO UNIT | 8 |
CONNECTING GROUND LEAD TO UNIT | |
GROUND | 8 |
ROUTING CONTROL POWER WIRES | 8 |
ACCESSORY ELECTRIC HEAT WIRING | 8 |
SPECIAL PROCEDURES FOR | 8 |
9 | |
9 | |
Check for Refrigerant Leaks | 10 |
LOCATE AND REPAIR REFRIGERANT LEAKS AND | |
CHARGE THE UNIT AS FOLLOWS: | 10 |
10 | |
CHECKING COOLING CONTROL OPERATION | 10 |
COMPRESSOR ROTATION | 10 |
Refrigerant Charge | 10 |
NO CHARGE | 10 |
LOW CHARGE COOLING | 10 |
TO USE THE COOLING CHARGING CHART | 10 |
HEATING MODE CHARGE | 11 |
Indoor Airflow and Airflow Adjustments | 11 |
FOR | 12 |
FOR | 12 |
Unit Controls | 12 |
12 | |
LOSS OF CHARGE SWITCH | 12 |
COMPRESSOR OVERLOAD | 12 |
Sequence of Operation | 12 |
FAN OPERATION | 12 |
COOLING | 14 |
HEAT PUMP HEATING | 14 |
DEFROST | 15 |
ELECTRIC RESISTANCE HEATING | 15 |
MAINTENANCE | 15 |
Air Filter | 16 |
Unit Top Removal | 16 |
Indoor Blower and Motor | 16 |
Outdoor Coil, Indoor Coil, and Condensate Drain Pan | 16 |
Outdoor Fan | 17 |
Electrical Controls and Wiring | 18 |
Refrigerant Circuit | 18 |
Indoor Airflow | 18 |
Metering Devices | 18 |
Lubrication | 18 |
Liquid Line Strainer | 18 |
High Flow Valves | 19 |
TROUBLESHOOTING | 22 |
23 |
NOTE TO INSTALLERÐBefore installation, READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY. Also, make sure the User's Manual and Replacement Guide are left with the unit after installation.
C00155
Fig. 1ÐUnit 50ZH
SAFETY CONSIDERATIONS
Installation and servicing of
Untrained workers can perform basic maintenance functions of cleaning coils and filters. All other operations should be performed by trained service people. When working on
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book | 1 | 4 | PC 101 | Catalog No. | Printed in U.S.A. | Form | Pg 1 | Replaces: | |
Tab | 6 | 8 |
|
|
|
|
|
|
|