BLOWER OFF-DELAY

24-V THERMOSTAT TERMINALS

3-AMP FUSE

LED OPERATION

&DIAGNOSTIC

TWINNING AND/OR

COMPONENT TEST

TERMINAL

HUMIDIFIER TERMINAL (24-VAC 0.5 AMP. MAX)

58PHA

LIGHT

BLOWER SPEED

HEAT

COOL

TRANSFORMER

24-VAC CONNECTIONS

SELECTION FAN

TERMINALS

SPARE 2

SPARE 1

115-VAC (L2)

NEUTRAL

CONNECTIONS

EAC-1 TERMINAL

(115-VAC 1.0 AMP. MAX.)

115-VAC (L1)

NEUTRAL

CONNECTIONS

PL1-LOW VOLTAGE

DRAIN HARNESS

CONNECTOR

PL2-HOT SURFACE

IGNITER & INDUCER

MOTOR CONNECTOR

A08063

Fig. 24 - Furnace Control

 

 

 

 

 

 

FIELD 24-V WIRING

 

 

 

 

 

 

FIELD 115-, 208/230-, 460-V WIRING

 

 

 

 

 

 

FACTORY 24-V WIRING

 

 

 

 

 

 

FACTORY 115-V WIRING

 

 

 

NOTE 2

 

THERMOSTAT

 

 

 

FIVE WIRE

 

W C R

G Y

FIELD-SUPPLIED

 

 

 

TERMINALS

 

 

 

 

 

 

 

THREE-WIRE

 

 

 

 

DISCONNECT

 

HEATING-ONLY

 

 

 

 

208/230- OR

BLOWER DOOR SWITCH

 

 

 

 

 

 

 

 

460-V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THREE

BLK

BLK

 

 

W

 

 

PHASE

 

 

 

 

 

WHT

WHT

 

C

R

 

 

 

 

O

 

 

 

 

 

 

 

N

 

 

 

208/230-V

 

GND

GND

T

 

 

 

SINGLE

115-V FIELD-

AUXILIARY

R

G

 

 

PHASE

O

 

 

 

 

 

SUPPLIED

J-BOX

L

COM

 

 

GND

DISCONNECT

 

 

NOTE 1

 

CONDENSING

 

 

 

 

Y/Y2

 

UNIT

 

 

 

 

 

 

 

 

 

 

 

24-V

 

TWO

 

 

 

TERMINAL

 

WIRE

 

 

 

 

BLOCK

 

 

 

 

 

FURNACE

NOTES: 1.

Connect Y-terminal in furnace as shown for proper blower operation.

 

 

2. Some thermostats require a "C" terminal connection as shown.

 

 

 

 

3. If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.

A99440

Fig. 25 - Heating and Cooling Application Wiring Diagram with 1-Stage Thermostat

24

Page 24
Image 24
Carrier 58PHA/PHX instruction manual Furnace Control