A03221
Fig. 23 - Field-Supplied Electrical Box on Furnace Casing
POWER CORD INSTALLATION IN FURNACE J-BOX
NOTE: Power cords must be able to handle the electrical requirements listed in Table 7. Refer to power cord manufacturer’s listings.
1.Remove cover from
2.Route listed power cord through
3.Secure power cord to
4.Secure field ground wire to green ground screw on
5.Connect line voltage leads as shown in Fig. 25.
6.Reinstall cover to
BX CABLE INSTALLATION IN FURNACE J-BOX
1.Remove cover from
2.Route BX cable into
3.Secure BX cable to
4.Secure field ground wire to green ground screw on
5.Connect line voltage leads as shown in Fig. 25.
6.Reinstall cover to
24-V WIRING
Make field
The
ACCESSORIES
1.Electronic Air Cleaner (EAC)
Connect an accessory Electronic Air Cleaner (if used) using
2.Humidifier (HUM)
Connect an accessory 24 VAC, 0.5 amp. maximum humidifier (if used) to the
NOTE: A
NOTE: DO NOT connect furnace control HUM terminal to HUM (humidifier) terminal on Thermidistatt, Zone Controller or similar device. See Thermidistat, Zone Controller, thermostat, or controller manufacturer’s instructions for proper connection.
VENTING
The furnace shall be connected to a listed factory built chimney or vent, or a
When an existing Category I furnace is removed or replaced, the original venting system may no longer be sized to properly vent the attached appliances. An improperly sized Category I venting system could cause the formation of condensate in the furnace and vent, leakage of condensate and combustion products, and spillage of combustion products into the living space.
58PHA
23