Physical Installation

Compliant Installation

NOTE: It is important the DS1/E1 Network Interface Cables are secured separately from the power and Signal Cables.

1.Inspect the unit.

2.Mount the unit, see Wall Mounting on page 2-5, or Rack Mounting on page 2-6for detailed instructions.

3.Ground the unit.

WARNING! THE SEPARATE PROTECTIVE EARTHING TERMINAL PROVIDED ON THIS PRODUCT SHALL BE PERMANENTLY CONNECTED TO EARTH. SEE GROUNDING THE UNIT ON PAGE 3-3.

4.Connect DS1 (T1), Ethernet and Amphenol connectors as needed.

Note: If Amphenol (25-pin telco) connector is used, a ferrite bead is required to meet compliance (see graphic above).

5.Connect RS-232 connector and open Terminal Emulator software on your PC. Note: With this running first, you can monitor the boot process.

6.Connect Power to the unit.

7.Monitor the boot process on your PC, when complete the status light should be green.

8.For any software enabled features, enter the key command. See the key command in the Adit 3000 CLI Reference Manual, for detailed information.

9.To verify use the show version command.

10.Now you can proceed to provisioning the unit. See Chapter 4, Configuration for information.

Ferrite Beads

To be compliant with EMI standards, a ferrite bead is required on the following cable:

Ferrite bead shipped with Adit chassis:

Ferrite Provided

Part Number

Intended For

1 large

P/N 010-0051

25-pair Telco cable (connector on the front of the Adit).

 

 

 

2-4

Adit 3104 - Release 1.6

Page 26
Image 26
Carrier Access Adit 3104 user manual Ferrite Beads, Ferrite bead shipped with Adit chassis