User Maintenance
To replace the lampzWhen replacing the lamp, use the special screwdriver that comes with the
1.Turn off the projector and unplug its AC power cord.
2.Wait for about 60 minutes to allow the projector’s current lamp to cool down completely.
3.Turn over the projector and place it on top of a desk or on some other stable surface.
4.Loosen the lamp cover screw, and then remove the lamp cover.
Lamp cover
105