COMMISSIONING BLOCK DIAGRAM

1

2

3

-Check correct motor direction (pg. 20)

-Select programme mode (pg. 21)

-Setting of gate limits (pg. 22-27)

NOTE: D3/D5 LIMITS ARE SET AUTOMATICALLY. A5 LIMITS ARE SET MANUALLY

4

5

-Function Selections(optional) (pg. 27-28)

-Timer/counter settings (optional) (pg. 29-30)

Steps 1 to 3 must be done on initial commissioning. Steps 4 & 5 are optional.