Chapter3 Installing the Content Engine
Installing a CE-511 or CE-566 Unit
3-4
Cisco Content Engine 511 and 566 Hardware Installation Guide
OL-5756-01
To install a Content Engine in a 2-post rack, follow these steps:
Step1 Attach a bracket to one side of the chassis, aligning the front flange of the bracket
with the hash mark on the side of the chassis. (See Figure3-2.)
Figure3-2 Installing the Chassis in the Rack
Step2 Attach a second bracket to the opposite side of the chassis in the same manner.
Step3 After you secure the brackets to the chassis, rack-mount the chassis by securing
the brackets to two posts or mounting strips in the rack. You need two people to
install the chassis in the rackā€”one person to hold the chassis and one person to
secure it to the rack.
The inlet and exhaust ports for cooling air are located in the front and rear of the
chassis, respectively; therefore, multiple Content Engines can be stacked with
little or no vertical clearance.
Installing the Chassis in a 4-Post Rack
Figure 3-3 shows the items that you need to install the Content Engine in a 4-post
rack. If any items are missing or damaged, contact your place of purchase.
124555
Front
Rear