scale: 3/8" = 1"
20
19
18
17
Figure 7 Installing an SFP
Table 10 SFP components
Item | Description |
1Bail
2SFP
EXT | 8 |
| CISCO | 12 | 4e | |||
|
| |||||||
7 |
|
|
|
| DS | 9 |
|
|
EXT |
|
| co | M |
|
|
| |
6 |
| Cis |
|
|
|
|
| |
|
|
|
|
|
|
|
EXT
5
EXT
| 1 |
2 | 181867 |
|
3.Insert the SFP into the port until you hear a click.
4.Close the bail.
Replacing the Switch
In some cases, you may need to replace a Cisco MDS 9124e Switch. To replace a Cisco MDS
9124e switch in the HP BladeSystem
1.Create a backup of the existing configuration file. As a best practice, regularly back up the Cisco MDS 9124e Switch configuration to a remote server. Do this for each switch in the SAN whenever you change the configuration. You can back up the configuration using either the
2.Disconnect all external fibre channel cables from the Cisco MDS 9124e Switch.
3.Remove the Cisco MDS 9124e Switch from the
4.Insert the new Cisco MDS 9124e Switch into the
5.Log in to the CLI of the
6.Connect to the console of the Cisco MDS 9124e Switch by issuing the following command:
OA> connect interconnect x
Where x is the interconnect bay number where the switch is installed.
Cisco MDS 9124e Fabric Switch for HP