4-2
Cisco SCE8000 Installation and Configuration Guide, Rel 3.1.7
OL-16478-02
Chapter 4 Installing the Cisco SCE8000 Chassis
Preparing for Installation
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Preparing for Installation, page 4-2
Installing the Cisco SCE8000 Chassis in the Rack, page 4-12
Connecting the System Ground, page 4-16
Installing the Power Supplies in the Cisco SCE8000 Chassis, page 4-18
Preparing for Installation
Safety, page 4-2
Site Requirements, page 4-2
Power Connection Guidelines, page 4-4
Safety
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the
absence of a suitably installed ground conductor. Contact the appropriate electrical inspection
authority or an electrician if you are uncertain that suitable grounding is available.
Warning
Read the installation instructions before connecting the system to the power source.
Warning
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
installation. Install only in accordance with national and local wiring regulations.
Site Requirements
This section provides site power requirements for the Cisco SCE8000 chassis. You should verify the site
power prior to installation.
Preventing Electrostatic Discharge Damage, page 4-3
Environmental Requirements, page 4-3
Power Requirements, page 4-3