BEER FAUCET (2)

UNIT POWER SWITCH

DRIP TRAY/CUP REST

(115 VAC, 60 HZ UNIT ONLY)

FIGURE 3. 1550 UNIVERSAL BEER DISPENSER

OPERATING CLEARANCES

Check area in front, back, sides, and above the Unit for obstructions. These areas must be kept clear at all times. Listed below are the minimum clearances that must be maintained.

A.Clearance above the Unit –––––––––––––––––––––––––––––12 inches to nearest obstruction.

B.Clearance back of Unit –––––––––––––––––––––––––––––––12 inches to nearest obstruction.

C.Clearance on sides of Unit –––––––––––––––––––––––––––––12 inches to nearest obstruction.

D.Clearance on front of Unit –––––––––––––––––––––––––––––Open

ADJUSTMENTS

ADJUSTING CO2 REGULATORS

(see Figure 2)

The CO2 regulators should be periodically checked for proper pressure settings and if necessary, be adjusted by a qualified Service Person.

ADJUSTING DISPENSED BEER FLOW RATE

Dispensed beer flow rate of the dispensing faucets should be periodically checked and if necessary, be adjusted by a qualified Service Person.

COOLING UNIT MAINTENANCE

CLEANING CONDENSER COIL

NOTE: Air circulation through the condenser coil, required to cool the coil, is drawn in through grille on Unit front panel and is exhausted out through grilles on sides and back of the Unit. Restricting air flow through the condenser coil will decrease cooling efficiency of the Unit.

Area in front, sides, and back of the Unit must be kept free of obstructions at all times which would prevent air flow in and out of the Unit.

569000246

12

Page 17
Image 17
Cornelius 1550 installation manual Operating Clearances, Adjustments, Cooling Unit Maintenance