Cornelius CR1400, IAC 322, IAC227 Plumbing Connections, Electrical, Installation Check Points

Models: IAC530 IWCS227 IWC522 IAC522 IAC330 IWC322 IWC330 IWC530 CR1400 CR1200 CR800 IAC227 IAC 322

1 83
Download 83 pages 13.44 Kb
Page 17
Image 17
PLUMBING CONNECTIONS

Electrical Service

Electrical Service

Line

Line

Manual Disconnect

Manual Disconnect

Switch

Switch

 

Shut-Off

Shut-Off Valve

Valve

 

Water Filter

Water Filter

STRAIN RE-

Shut-Off Valve

LIEF

 

MUST BE

Condenser Water Inlet

USED

 

Dump

Strain Relief

Valve

must be used

Bin Drain

Tube

AIR-COOLED MODELS

Drain Tube

Dump Valve

Drain Tube

Condenser Water

Drain Tube

Floor

Floor

Drain

Drain

 

Bin Drain

Tube

WATER-COOLED MODELS

Note: Leave all panels on the cuber until it is in place on the bin.

PLUMBING CONNECTIONS

1.All plumbing lines and connections must conform to local and national plumbing codes.

2.Line shut-off valves must be located in supply water lines for cuber and condenser if product is water- cooled. Water supply to water-cooled condenser must include a stand-pipe to prevent “water hammer”.

3.Should your local water supply quality require the installation of a water filter system, consult your local dis- tributor or dealer for proper size required.

4.Water supply pressure must not be lower than 20 PSI (1.37 BAR), nor should it exceed 120 PSI (8.16 BAR).

NOTE: Water filters larger then 5 microns do not give proper protection. Water pressures above 80 PSI (5.44 BAR) will destroy the filter.

DRAIN LINES: Bin and cuber drain lines must never be connected together and must be vented.

NOTE: All HP-62 (R404A) ice machines have a voltage range of –5%, +10% from the serial palte rating.

ELECTRICAL

1.All wiring and connections must conform to national and local electrical codes.

2.Wire size and circuit protection must conform to specifications and cuber must be on a separate electrical circuit.

3.Strain relief connectors must be used at the junctions box of the control box and the cuber.

4.Cuber must be grounded by the control box ground screw or other method for intentional safety grounding that meets code requirements.

5.A manual disconnect in a convenient location to the cuber must be installed.

INSTALLATION CHECK POINTS

1.Has bin and cuber been leveled and sanitized?

2.Does electrical and plumbing meet code requirements?

3.Check correct operating water level in the water pan.

166240004

14

12/1/94 Rev 3/4/96

Page 17
Image 17
Cornelius CR1400, IAC 322, IAC227, CR800, CR1200, IWC530, IWC330 Plumbing Connections, Electrical, Installation Check Points