Pre-Installation Preparation
Continued
36"
(91.4 cm)
36 1/4" |
|
(92.1 cm) | 14 3/4" |
| (37.5 cm) |
|
| 14 3/4" |
|
| (37.5 cm) |
21" (53.3 cm) |
| ** |
To Center of |
| |
28 5/8" Top Vent |
|
|
(72.7 cm) |
| 14 3/4" (37.5 cm) |
|
| to Nailing |
|
| Flanges |
|
| 12 1/4" |
|
| (31 cm) |
56 | 3/4" | to Opening |
| ||
(144 cm) |
|
**These dimensions allow for 1" clearance at sides and back of fireplace. However, 0" clearance is also permitted at all sides when framed.
Figure 6 - Framing Clearances for Corner
Installation
Figure 5 - Framing Clearances for Flush
Wall Installation
14 3/4" (37.5 cm)
to Nailing Flanges
7 7/8" (20 cm) to
Center of 4"
57/8"
(15 cm) to
Nailing
Flange
353/4"
(90.8 cm)
|
|
|
|
Inlet |
| 36 1/4" (92.1 cm) to Nailing Flange | |
Electrical |
|
|
|
cm) |
38"
(96.5 cm) 2" (5.1 cm)
1 1/4" | 5/8" |
(3.2 cm) | (16 mm) |
(91.4 cm) Dimensions |
|
36" Face |
|
cm)
Wall Switch
Wireway
8" (20.3 cm) Gas Supply
Inlet
(11.4 cm) | 36 3/4" (93.4 | |||
/2" |
|
|
| |
4 1 |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
36 1/4" (92.1 cm)
Face Dimensions
37" (94 cm)
to Nailing Flange
1 1/2" (3.8 cm)
2 1/2" (6.4 cm)
Wall Switch
Wireway
111/8"
(28.3 cm) Air Kit Location
15 3/8"
(39 cm)
6" (15.2