Recommended Shutdown Procedure | |
Last Resort Shutdown Procedure |
Appendix A: Specifications
COM Port Pinout Assignments | |
Regulatory Compliance |
Appendix B: Mode Switch Bank Settings and Optional Installations
Required Tools | |||
Setting the Mode Switches | |||
Memory Locations and Replacement Procedures | |||
Location of Memory Modules | |||
Flash DIMM Replacement Procedure | |||
DRAM SIMM Replacement Procedure | |||
Index |
|
|
|
Figures |
|
|
|
Installing Module into Matrix E7 or Matrix N7 Chassis (E7 shown) | |||
Installing Module into N3, N1, or N5 Chassis (N3 shown) | |||
Connecting a Twisted Pair Segment to the | |||
| |||
|
|
| |
Between Switches and | |||
|
|
| |
Connecting an IBM PC or Compatible | |||
Connecting a VT Series Terminal | |||
Connecting to a Modem | |||
Matrix DFE Startup Screen Example (N7 Chassis) | |||
LANVIEW LEDs | |||
OFFLINE/RESET Switch | |||
Mode Switch Location on | |||
Memory Module Locations on the | |||
NEM Removal and DIMM Connector Location | |||
Removing the Existing DIMM | |||
Installing the DIMM | |||
Removing Existing DRAM SIMM | |||
Installing the DRAM SIMM | |||
Tables |
|
|
|
Contents of | |||
LANVIEW LEDs | |||
Troubleshooting Checklist | |||
Specifications for | |||
COM Port Pin Assignments | |||
Compliance Standards |
x