Manuals
/
Enterasys Networks
/
Computer Equipment
/
Network Router
Enterasys Networks
2G4082-25, 9034310-01
manual
Models:
2G4082-25
9034310-01
1
56
58
58
Download
58 pages
25.55 Kb
51
52
53
54
55
56
57
58
Troubleshooting
Specifications
Install
Connecting to the Network
Lanview Diagnostic LEDs
Recommended Shutdown Procedure
Setting the Mode Switches
How to
What is
Page 56
Image 56
Memory Locations and Replacement Procedures
B-8
Mode Switch Bank Settings and Optional Installations
Page 55
Page 57
Page 56
Image 56
Page 55
Page 57
Contents
Enterasys Matrix
Page
Page
Regulatory Compliance Information
Electromagnetic Compatibility EMC
Supplement to Product Instructions
Vcci Notice
Enterasys NETWORKS, INC. Firmware License Agreement
Vii
Viii
Contents
Tables
Appendix a Specifications
Index
Important Notice
About This Guide
Who Should Use This Guide
How to Use This Guide
Related Documents
Conventions Used in This Guide
Getting Help
Getting Help
Introduction
Overview of DFE Series Capabilities
DFE-Platinum Module
2G4082-25
DFE
Switch Configuration Using WebView
Switch Configuration Using CLI Commands
Network Expansion Module NEM Option
Connectivity
Standards Compatibility
Lanview Diagnostic LEDs
Secure Networks Policy Support
Lanview Diagnostic LEDs Introduction
Network Requirements
Link Aggregation
10BASE-T Network
100BASE-TX Network
1000BASE-T Network
1000BASE-SX/LX/ELX Network
Installation
Unpacking the DFE-Platinum Module
Installing Optional Network Expansion Modules
Installing Module into Matrix E7 or N7 Chassis
Installation
Preparation
Card guides
Installing Module into Matrix N1, N3, or N5 Chassis
Connecting to the Network
Connecting UTP Cables
Connecting a Twisted Pair Segment to the DFE-Platinum Module
RX+
TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4
Connecting to an IBM PC or Compatible Device
Connecting to COM Port for Local Management
What Is Needed
Connecting to a VT Series Terminal
Connecting an IBM PC or Compatible
Connecting to a Modem
Connecting a VT Series Terminal
Adapter Wiring and Signal Assignments
DB9
Modem Port Adapter Wiring and Signal Diagram
Completing the Installation of a New System
First-Time Log-In Using a Console Port Connection
Logging in with an Administratively-Configured User Account
11 Matrix DFE Startup Screen Example N7 Chassis
Troubleshooting
Using Lanview
About the Management Mgmt LED
Viewing the Receive and Transmit Activity
LED
Alternating 67% on, 33% off
Troubleshooting Checklist
Series Configuration Guide for proper setup
Overview of DFE-Platinum Module Shutdown Procedure
Recommended Shutdown Procedure
Specifications
DFE-Platinum Module Specifications
COM Port Pinout Assignments
Regulatory Compliance
Required Tools
Mode Switch Bank Settings Optional Installations
Setting the Mode Switches
Memory Locations and Replacement Procedures
Figure B-1 Mode Switch Location on 2G4082-25
Removing the Dimm from 2G4082-25
Flash Dimm Replacement Procedure
Location of Memory Modules
Figure B-3 NEM Removal and Dimm Connector Location
Installing the Dimm
Dimm
Removing the Dram Simm
Dram Simm Replacement Procedure
Installing the Dram Simm
Figure B-7 Installing the Dram Simm
Page
Index
Numerics
Index-2
Top
Page
Image
Contents