Enterasys Networks 6H352-25 manual INSTALLING THE MODULE INTO THE SmartSwitch CHASSIS

Models: 6H352-25

1 56
Download 56 pages 21.77 Kb
Page 31
Image 31
3.4INSTALLING THE MODULE INTO THE SmartSwitch CHASSIS

Installing the Module into the SmartSwitch Chassis

5.Examine the module for damage. If any damage exists, DO NOT install the module. Immediately contact Enterasys Networks. Refer to Getting Help, in About This Guide.

CAUTION: To prevent damaging the backplane connectors in the following step, take care that the module slides in straight and properly engages the backplane connectors.

Ensure that the top plastic locking tab lines up with the desired slot number located on the front panel of the chassis. Refer to Figure 3-1.

6.Locate the slot guides that line up with the number of the slot in which the module will be installed. Install the module in the chassis by aligning the module circuit card between the upper and lower metal rail guides of the desired slot, sliding it into the chassis, and locking down the top and bottom plastic locking tabs, as shown in Figure 3-1. Take care that the module slides in straight and properly engages the backplane connectors.

7.If the chassis in which the module is installed was powered down for the installation, turn it back on. Check to see that the CPU LED settles at solid green after a few minutes. If the LED does not turn solid green, see Chapter 4 for details.

3.4INSTALLING THE MODULE INTO THE SmartSwitch CHASSIS

CAUTION: Failure to observe static safety precautions could cause damage to the 6H352-25. Follow static safety handling rules and wear the antistatic wrist strap provided with the SmartSwitch 6000 chassis.

Do not cut the non-conductive bag to remove the module. Sharp objects contacting the board or components can cause damage.

Certain restrictions apply when installing the 6H352-25 into the SmartSwitch 6000 chassis. Refer to the Release Notes for any updated information concerning installing the modules into the SmartSwitch 6000 chassis. Otherwise, the installation procedure from Section 3.4 can be followed, with the exception that the 6C105 chassis has only 5 slots as opposed to the 7 slots in the MATRIX E7. The 6H352-25 can be installed in any of the slots that are available. To install a module, refer to Figure 3-2and proceed as in Section 3.3.

NOTE: The Distributed Chassis Management and SecureFast Switching functionality is supported when the modules are installed in a SmartSwitch 6000 chassis. Refer to the module release notes for specific information on supported functionality.

Installation 3-5

Page 31
Image 31
Enterasys Networks 6H352-25 manual INSTALLING THE MODULE INTO THE SmartSwitch CHASSIS