Initial Installation
QUALIFIED INSTALLERS ONLY
PLANNING YOUR INSTALLATION:
When planning your installation, it will be necessary to select the proper length of vent pipe for your particular requirements. It is important to note when passing through a wall, the maximum allowable wall thickness is 10 inches (25.4 cm), 11⁄2 inches (3.8 cm) clearance to combustibles must be maintained. Select the amount of vertical rise desired for
| for sufficient vent height above the roof line. For two | |||||
Round Support | story applications, a fire stop is required at each floor | |||||
Box/Wall Thimble | level. If an offset is needed in the attic, additional pipe | |||||
| and elbows will be required. To connect the venting | |||||
| system to the appliance flue outlet, a | |||||
| is built into the appliance at the factory. Refer to ‘Vent | |||||
Horizontal | Configuration | and | Restrictor | Settings’ | for | venting |
Termination | parameters. |
|
|
|
|
|
|
|
|
|
|
| |
Pipelength | Your total vent pipe length must be within the shaded | |||||
| area of Figure 12. If a 90° elbow is used in the | |||||
90° Elbow | horizontal plane, 36” (91.4 cm) must be subtracted | |||||
| from the allowable horizontal run. |
|
| |||
| There are three (3) basic types of Direct Vent System | |||||
| installations. The three (3) types of installations are | |||||
| shown in Figures 13 through 15. |
|
| |||
Pipelength |
|
|
| Vertical |
|
|
|
|
| Termination |
| ||
|
|
|
|
| ||
Figure 13: Common Horizontal Installation. |
|
|
| Storm Collar |
| |
|
|
|
| Flashing |
| |
36" (915 mm) |
|
|
|
|
|
|
Snorkel |
|
|
| Ceiling Firestop | ||
|
|
|
| |||
| Round Support |
|
|
| ||
Round Support | Box/Wall Thimble |
|
|
| ||
|
|
|
|
|
| |
Box/Wall Thimble |
|
|
|
|
|
|
|
|
|
| Cathedral Ceiling | ||
|
|
|
| Support Box | ||
|
|
|
| Pipelength |
|
|
2 ft (610 mm) |
|
|
|
|
|
|
Pipelength |
|
|
| Pipelength |
|
|
|
|
|
|
|
| |
45° Elbow |
|
|
|
|
|
|
Figure 15: Common Snorkel Installation. | Figure 14: Common Vertical Installation. |