Installation

5.Mount the block-off plate using masonry screws in a masonry fireplace and sheet metal screws on a zero- clearance fireplace (screws need only be long enough to penetrate the first layer of metal).

6.Insulate the block-off plate

using high-temperature fiberglass insulation and furnace cement.

Damper must be removed

Zero-clearance (metal) firebox

IMPORTANT:

DO NOT modify any part of the ZC fireplace

Mantel

Stainless steel chimney connector must extend 12" (305mm) past the block-off plate.

Block-off plate or damper adaptor.

Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Figure 40: Insert Install into a Zero-Clearance Fireplace.

Damper removed or fastened open

Mantel

The stainless steel

chimney connector must

extend 12" (305mm) past the block-off plate.

Block-off plate or

damper adaptor. Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Masonry Fireplace

Figure 41: Masonry Fireplace Direct Connection Insert Install.

7.After installing the unit into place and the pipe through the block-off plate, use high-temperature fiberglass insulation and furnace cement to seal any gaps between the pipe and block- off plate (allow the cement to dry for at least 24 hours before burning).

Before starting this type of installation

refer to INSTALLATION - MASONRY FIREPLACE INSTALLATION - INSERT for additional

information. For clearances refer to

SPECIFICATIONS - CLEARANCES TO COMBUSTIBLES -

1200 INSERT and SPECIFICATIONS - CLEARANCES

TO COMBUSTIBLES - 1700 INSERT. See Figure

40 and 41 for examples of a masonry fireplace and a zero-clearance fireplace with a direct connection

34

Page 34
Image 34
Enviro 1200 Fireplace Freestanding, C-11116, 1700 Insert, 1200 Insert Insert Install into a Zero-Clearance Fireplace